Difference between revisions of "Involved people and impressum"
m (→Involved people) |
m (included GEO names, smoothened text) |
||
| Line 1: | Line 1: | ||
== Involved people == | == Involved people == | ||
| − | This work is based on a collaboration project between DTU Environment and the Capital Region of Denmark (Region H). | + | This work is based on a collaboration project between DTU Environment and the Capital Region of Denmark (Region H) running in the period from 2014-2017. |
| − | GEO was subcontracted to assist in conducting | + | Part of the project was a long-term pumping test. |
| + | GEO was subcontracted to assist in drilling boreholes, conducting the pumping test, including measurements and the geological characterization of the Akacievej field site. | ||
The pumping test was planned by DTU and GEO, with GEO being responsible for executing the test and evaluating the data in collaboration with DTU. | The pumping test was planned by DTU and GEO, with GEO being responsible for executing the test and evaluating the data in collaboration with DTU. | ||
The pumping test was combined with six tracer tests and contaminant sampling carried out by DTU Environment. | The pumping test was combined with six tracer tests and contaminant sampling carried out by DTU Environment. | ||
| Line 19: | Line 20: | ||
* Niels D. Overheu | * Niels D. Overheu | ||
* Anna Toft | * Anna Toft | ||
| + | |||
| + | === GEO === | ||
| + | * John U. Bastrup | ||
| + | * Magnus M. Rohde | ||
| + | * Christian Helweg | ||
| + | * Johanne A. Andersen | ||
| + | * | ||
Return to [[Content]] | Return to [[Content]] | ||
Revision as of 13:20, 8 February 2017
Involved people
This work is based on a collaboration project between DTU Environment and the Capital Region of Denmark (Region H) running in the period from 2014-2017. Part of the project was a long-term pumping test. GEO was subcontracted to assist in drilling boreholes, conducting the pumping test, including measurements and the geological characterization of the Akacievej field site. The pumping test was planned by DTU and GEO, with GEO being responsible for executing the test and evaluating the data in collaboration with DTU. The pumping test was combined with six tracer tests and contaminant sampling carried out by DTU Environment.
The following people are involved in the project:
DTU Environment
- Poul L. Bjerg
- Philip J. Binning
- Mette M. Broholm
- Klaus Mosthaf
- Annika S. Fjorbøge
- Bentje Brauns
Capital Region of Denmark
- Henriette Kerrn-Jespersen
- Niels D. Overheu
- Anna Toft
GEO
- John U. Bastrup
- Magnus M. Rohde
- Christian Helweg
- Johanne A. Andersen
Return to Content