Difference between revisions of "Conceptual modeling"
m (→The field site: Akacievej, Hedehusene) |
m |
||
| Line 5: | Line 5: | ||
* Excavation of most polluted soil (DNAPL) in 2006 | * Excavation of most polluted soil (DNAPL) in 2006 | ||
* Installation of a pump-and-treat remediation system in 2007: pumping with 2.5 m3/h, treatment with activated carbon and reinfiltration | * Installation of a pump-and-treat remediation system in 2007: pumping with 2.5 m3/h, treatment with activated carbon and reinfiltration | ||
| + | |||
| + | [[File:PlumeExtent2006-2015.png|600px| Remediation system and contaminant plume in 2006 and 2015]] | ||
== Conceptual model development == | == Conceptual model development == | ||
Revision as of 09:00, 16 September 2016
Contents
The field site: Akacievej, Hedehusene
Description of the field site, spill history, overview
- Former dry cleaning facility in Denmark (1973-2003)
- PCE spill in 1976 → dissolved plume with ca. 400 m length
- Excavation of most polluted soil (DNAPL) in 2006
- Installation of a pump-and-treat remediation system in 2007: pumping with 2.5 m3/h, treatment with activated carbon and reinfiltration
Conceptual model development
The setup of the conceptual model for the Akacievej field site is going to be explained.
Geologic model
Geologic model, hydrogeology, contaminant distribution etc.
Flow model
Contaminant distribution and dynamics
PCE concentration measurements before, during and after the pumping test, combined with previous investigations. Modeling interpretations and conceptual model of the plume propagation.